{"id":1843,"date":"2017-11-03T15:51:47","date_gmt":"2017-11-03T12:51:47","guid":{"rendered":"http:\/\/apnip.water.gov.kg\/?p=1843"},"modified":"2018-07-19T15:54:38","modified_gmt":"2018-07-19T12:54:38","slug":"competition-for-the-position-chief-engineer","status":"publish","type":"post","link":"https:\/\/apnip.water.gov.kg\/?p=1843&lang=en","title":{"rendered":"Competition for the position: chief engineer"},"content":{"rendered":"<p><strong>World Bank Project Implementation Unit under the Department of Water Resources and Land Improvement, financed by Global Agriculture and Food Security Program under the Agricultural Productivity and Nutrition Improvement Project, (Grant TF0A0645)\u00a0announces a competition for the position: CHIEF ENGINEER<\/strong><\/p>\n<p>Minimum qualification requirements:<\/p>\n<ol class=\"bullet\">\n<li>Higher education in hydraulic construction, water supply and sanitation.<\/li>\n<li>Availability of certificate on engineering services.<\/li>\n<li>At least five-year work experience in designing of HTS or providing services on technical supervision over HTS construction.<\/li>\n<\/ol>\n<p>The interested candidates shall submit letter of interest, CV in Russian and English languages, reference letters, as well as copies of appropriate diplomas and\/or certificates <span style=\"color: #ff0000;\"><strong>till 18-00 hours on November 15, 2017<\/strong><\/span> at the following address:<\/p>\n<p style=\"text-align: center;\"><strong>Project Implementation Unit for the \u201cAgricultural Productivity and Nutrition Improvement Project\u201d under the Department of Water Resources and Land Improvement of the KR,<\/strong><br \/>\n<strong>Bishkek city, Toktonaliev street 4\u0430, room #103 or #104<\/strong><br \/>\n<strong>Phone: 54-91-03<\/strong><br \/>\n<strong>Phone\/Fax: 54-49-72, e-mail: apnip@elcat.kg<\/strong><\/p>\n<p>Applications without indication of position name, comprising incomplete documents package, submitted later than indicated period and which not meet with relevant requirements, will not be considered.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>World Bank Project Implementation Unit under the Department of Water Resources and Land Improvement, financed by Global Agriculture and Food<\/p>\n","protected":false},"author":1,"featured_media":688,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[63,257],"tags":[],"_links":{"self":[{"href":"https:\/\/apnip.water.gov.kg\/index.php?rest_route=\/wp\/v2\/posts\/1843"}],"collection":[{"href":"https:\/\/apnip.water.gov.kg\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/apnip.water.gov.kg\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/apnip.water.gov.kg\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/apnip.water.gov.kg\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1843"}],"version-history":[{"count":1,"href":"https:\/\/apnip.water.gov.kg\/index.php?rest_route=\/wp\/v2\/posts\/1843\/revisions"}],"predecessor-version":[{"id":1845,"href":"https:\/\/apnip.water.gov.kg\/index.php?rest_route=\/wp\/v2\/posts\/1843\/revisions\/1845"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/apnip.water.gov.kg\/index.php?rest_route=\/wp\/v2\/media\/688"}],"wp:attachment":[{"href":"https:\/\/apnip.water.gov.kg\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1843"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/apnip.water.gov.kg\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1843"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/apnip.water.gov.kg\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1843"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}